STATUS: PILOT DEPLOYMENT PHASE 1 • Q3 2026 COMMERCIAL COHORT
CONTROLLED ACCESS: BY INVITATION ONLY
RP
RAMS PORTAL Compliance Infrastructure
Explore Sandbox
2026 ESTATE PILOT PROGRAMME | LIMITED UK COHORT AVAILABILITY

Contractor Access Governance & Digital Risk Verification Infrastructure.

A standardized regulatory system for UK Commercial Real Estate. Eliminates unstructured PDF email chains, automates statutory pre-qualification against CDM 2015 regulations, and maintains an immutable audit trail for building owners and principal contractors.

Explore Interactive Sandbox
CDM 2015
Strict Regulation 8 & 15 Duty of Care Enforcement
< 3.0s
Gatehouse Electronic Token Verification
100%
Golden Thread Digital Evidence Trail
System Manifest VERIFIED SPEC
Core Object RAMS & Contractor Onboarding
Jurisdiction United Kingdom (England & Wales)
Deployment Status 2026 Estate Pilot Cohort (Phase 1)
Availability Controlled Access / By Invitation Only
Insurance Baseline £10,000,000 Public Liability Validation
Hazard High-Risk Hot Works, Confined Space, Working at Height, LOTO
Gate Authentication Dynamic 2D Cryptographic QR Site Pass
Audit Redundancy Append-Only PostgreSQL Security Log
Duty Holder Notice: System provides technical evidence of verification prior to permit issuance. Legal responsibility remains with appointed estate duty holders under HASAWA 1974.
Section 01

The Statutory Verification Protocol

A four-stage sequential gate preventing unvetted or un-inducted personnel from setting foot in operational plant areas.

PHASE 01

Contractor Submission

Subcontractor lead submits scope of works, operatives list with CSCS card numbers, insurance certificates, and step-by-step methodology.

Output: Status PENDING
PHASE 02

Duty Holder Audit

Facilities compliance officer evaluates 5×5 risk matrix, PPE requirements, and plant isolations. Approved with single-click cryptographic stamp or returned for revision.

Output: Status APPROVED
PHASE 03

Gate Verification

Upon arrival, technician presents digital site pass on mobile device. Reception or gatehouse scanner confirms identity, zone capacity, and valid insurance in under 3 seconds.

Output: Status ON_SITE
PHASE 04

Audit & Evacuation

Real-time live roster logs exact building occupancy. In the event of emergency, instant Roll Call dashboard provides complete headcount for emergency services.

Output: Immutable Audit Log
Section 02

Complete Modular Specifications

Modular deployment architecture designed to scale from single commercial assets to nationwide real estate portfolios.

Ref
Module Name
Deployment Tier
Functional Scope
Implementation State
MOD-01
Contractor Access & RAMS
Core MVP
Standardized submission portal, 5×5 matrix, PPE selection, approval threads.
Active in Portal
MOD-02
Dynamic Risk Assessment (DRA)
Mobile Field PWA
Point-of-work last-minute risk checks, on-site photo evidence log, touch sign-off.
Field Ready
MOD-03
Permits to Work (PTW)
Operations
Electronic high-risk permits: Hot Works, Confined Space, Roof Access, LOTO.
Active in Portal
MOD-04
Online Site Inductions
Operations
Automated pre-arrival video briefing and 5-point comprehension assessment.
Roadmap / Q3
MOD-05
Digital Sign-In & Roll Call
Operations
Turnstile QR scan, zone headcount caps, instant emergency evacuation roster.
Active in Portal
MOD-06
Competency & Insurance Matrix
Enterprise
Automated verification of £10M policy dates, CSCS, Gas Safe, and IPAF cards.
Active in Portal
MOD-07
Key & Plant Room Access
Enterprise
Access to critical HV, switchrooms, and riser shafts locked to active permits.
Active in Portal
MOD-08
Incident & Near-Miss Log
Enterprise
Mobile hazard submission with timestamped photo records for RIDDOR compliance.
Roadmap / Q4
MOD-09
Mobile Site Audits
Enterprise
Scheduled supervisor estate inspections and automatic compliance reporting.
Roadmap / Q4
Section 03

UK Statutory & Regulatory Framework

Demonstrated compliance mechanisms aligned with primary British health, safety, and commercial property statutes.

CDM REGULATIONS 2015

SI 2015/51

Implements the statutory requirements under Regulations 8 & 15. Requires commercial clients and principal contractors to verify that any organization appointed to carry out construction or plant maintenance possesses the necessary skills, knowledge, and experience.

Standard: CSCS card verification, documented site inductions, signed SSOW.

BUILDING SAFETY ACT 2022

Part 4 • Golden Thread

Maintains a continuous, immutable record of maintenance events, high-risk plant interventions, and structural/roof modifications. Enables accountable persons to demonstrate active risk management to the Building Safety Regulator (BSR).

Standard: Timestamped permit records, photo logs, gas monitor test results.

HASAWA 1974 & MHSWR 1999

Section 2 & 3 Duty of Care

General duty of employers and building operators to conduct operations so that persons not in their employment who may be affected are not exposed to health and safety hazards.

Standard: Formal Risk Assessment & Method Statement sign-off prior to commencement.

FIRE SAFETY ORDER 2005

SI 2005/1541

Article 14 & 15 mandates clear emergency routes, exits, and accounting for all building occupants. Live Roster module gives responsible persons an instant count of all third-party personnel.

Standard: Real-time electronic evacuation roll call accessible on mobile.
Section 04

Operational & Administrative Impact Model

Audited metrics reflecting reduction in administrative overhead and turnstile delays across standard commercial property assets.

60 attendances
10 (Single Property) 150 (Major Complex) 300+ (Portfolio)
35 minutes
15 mins (Standard) 35 mins (Average UK Real Estate) 90 mins (Complex / High Risk)
Annual Delay
420 hrs
Management time lost
Financial Equivalent
£27,300
At £65.00/hr benchmark
Recoverable Capacity
£22,386
82% cycle reduction
Section 05

The Architectural Advantage

Structural differentiation: Why generic visitor reception kiosks and legacy enterprise software fail to govern technical operations and statutory duty of care.

01. PURPOSE-BUILT VS. GENERIC RECEPTION KIOSKS

ENGINEERING SPEC

Standard front-desk tablets log visitor names for coffee meetings. They possess zero technical architecture to evaluate 5×5 risk matrices, permit-to-work isolations (Hot Works, Confined Spaces), or £10,000,000 statutory insurance covenants. RAMS Portal is engineered strictly for estate engineering, technical compliance, and CDM 2015 duty holders.

Operational Result: Eliminates the dangerous compliance blind spot between ground-floor reception and roof plant rooms.

02. BRIDGING THE OFFICE-TO-FIELD DISCONNECT

DYNAMIC POINT-OF-WORK

In legacy systems, static RAMS documents are rubber-stamped in an off-site office days prior, remaining archived in email while real site conditions change. RAMS Portal couples statutory permits with Point-of-Work Dynamic Risk Assessments (DRA), enforcing on-site photo evidence and hazard re-evaluation immediately before tools turn.

Operational Result: Real-time environmental verification replaces unread paperwork on site.

03. ZERO-HARDWARE CAPITAL EXPENDITURE

RAPID DEPLOYMENT

Traditional access control requires months of procurement, proprietary server installations, and physical turnstile rewiring. RAMS Portal deploys within 24 hours over standard web infrastructure. Gatehouse personnel and contractors utilize any existing tablet, smartphone, or browser with zero local software footprints.

Operational Result: Immediate multi-building estate rollout without CapEx authorization delays.

04. IMMUTABLE "GOLDEN THREAD" EVIDENCE TRAIL

STATUTORY PROTECTION

In the event of an HSE inquiry or insurance audit, duty holders are no longer forced to search through fragmented mailbox threads. Every permit approval, credential verification, and gatehouse timestamp is recorded with cryptographic integrity. Complete statutory audit dossiers are generated in a single click.

Operational Result: Complete regulatory protection under Section 3 of the Health & Safety at Work etc. Act 1974.
Deploy Statutory Compliance Infrastructure

Register your commercial building for the 2026 Estate Pilot Cohort (Phase 1) or evaluate the live demonstration system with preloaded estate data.

Deployment SLA: 24-Hour Zero-Hardware Rollout • CDM 2015 & BSA 2022 Aligned
Explore Interactive Sandbox